With the maiden flights showing a tail-heavy bird, I moved the ESC up to the front of the firewall. The ESC and the wires are held in place with zip ties run through slots cut in the foam.
The Arlene Turner Memorial Moth build
← The Arlene Turner Memorial Moth build
With the maiden flights showing a tail-heavy bird, I moved the ESC up to the front of the firewall. The ESC and the wires are held in place with zip ties run through slots cut in the foam.